Background
An equipment integrator / manufacturer in Consumer electronics needed to metered filling on a camera module using UV-curing structural adhesive.
Process challenge
Supply pressure ripple during continuous running, causing volume drift.
Solution
We recommended Screw Valve + Dispensing Valve, with adding regulated supply with a drum pump for continuous feed to suppress pressure ripple.
Result
- Setup time cut from 40 minutes to under 15 minutes.
- Shot volume 4 mL with deviation within ±3%.
- Cycle time 0.6 s per dot with no stringing or dripping during continuous running.
Project facts
- Industry: Consumer electronics
- Workpiece: camera module
- Fluid: UV-curing structural adhesive
- Process: metered filling
- Recommended lines: Screw Valve, Dispensing Valve
Note: this case is placeholder demo content showing the structure of the section. Replace it with real project data before publishing.
Scan to visit our site