Background
An equipment integrator / manufacturer in Automotive electronics needed to potting on a ECU unit using filled thermal gel.
Process challenge
Particle fillers settling and clogging after long idle periods.
Solution
We recommended Pneumatic Valve + Glue Supply System, with replacing time-pressure control with a positive-displacement screw valve to meter by volume.
Result
- Volume drift held within ±3% over an 8-hour run.
- Shot volume 0.4 mL with deviation within ±3%.
- Cycle time 0.3 s per dot with no stringing or dripping during continuous running.
Project facts
- Industry: Automotive electronics
- Workpiece: ECU unit
- Fluid: filled thermal gel
- Process: potting
- Recommended lines: Pneumatic Valve, Glue Supply System
Note: this case is placeholder demo content showing the structure of the section. Replace it with real project data before publishing.