Menu

Precision Fluid Control Components · R&D / Manufacturing / OEM Support

2025.11.04

New energy and storage storage module metered filling: polyurethane potting compound case study

Background

An equipment integrator / manufacturer in New energy and storage needed to metered filling on a storage module using polyurethane potting compound.

Process challenge

Supply pressure ripple during continuous running, causing volume drift.

Solution

We recommended Glue Supply System + Screw Valve + Glue Distributing Machine, with pairing a micro screw valve with a level sensor in closed loop for accurate volumetric output.

Result

  • Setup time cut from 40 minutes to under 15 minutes.
  • Shot volume 0.4 mL with deviation within ±2%.
  • Cycle time 0.8 s per dot with no stringing or dripping during continuous running.

Project facts

  • Industry: New energy and storage
  • Workpiece: storage module
  • Fluid: polyurethane potting compound
  • Process: metered filling
  • Recommended lines: Glue Supply System, Screw Valve, Glue Distributing Machine

Note: this case is placeholder demo content showing the structure of the section. Replace it with real project data before publishing.

Enquiry Call us
400-000-0000
WeChat Scan to visit our site Scan to visit our site
Email
sales@example.com