Menu

Precision Fluid Control Components · R&D / Manufacturing / OEM Support

2026.05.14

New energy and storage CCS busbar sealing and bonding: filled thermal gel case study

Background

An equipment integrator / manufacturer in New energy and storage needed to sealing and bonding on a CCS busbar using filled thermal gel.

Process challenge

Tight cycle time with frequent changeovers that squeeze setup time.

Solution

We recommended Glue Supply System + Screw Valve + Glue Distributing Machine, with adding regulated supply with a drum pump for continuous feed to suppress pressure ripple.

Result

  • Potting void defects reduced from 4% to below 1%.
  • Shot volume 0.02 mL with deviation within ±2%.
  • Cycle time 1.1 s per dot with no stringing or dripping during continuous running.

Project facts

  • Industry: New energy and storage
  • Workpiece: CCS busbar
  • Fluid: filled thermal gel
  • Process: sealing and bonding
  • Recommended lines: Glue Supply System, Screw Valve, Glue Distributing Machine

Note: this case is placeholder demo content showing the structure of the section. Replace it with real project data before publishing.

Enquiry Call us
400-000-0000
WeChat Scan to visit our site Scan to visit our site
Email
sales@example.com