Menu

Precision Fluid Control Components · R&D / Manufacturing / OEM Support

2026.05.26

New energy and storage battery pack housing metered filling: polyurethane potting compound case study

Background

An equipment integrator / manufacturer in New energy and storage needed to metered filling on a battery pack housing using polyurethane potting compound.

Process challenge

Micro-litre volumes with expensive material and no waste allowed.

Solution

We recommended Glue Supply System + Screw Valve + Glue Distributing Machine, with fitting quick-change interfaces and parameter recipes to shorten setup time.

Result

  • Overall equipment availability improved by about 12%.
  • Shot volume 0.008 mL with deviation within ±2%.
  • Cycle time 0.8 s per dot with no stringing or dripping during continuous running.

Project facts

  • Industry: New energy and storage
  • Workpiece: battery pack housing
  • Fluid: polyurethane potting compound
  • Process: metered filling
  • Recommended lines: Glue Supply System, Screw Valve, Glue Distributing Machine

Note: this case is placeholder demo content showing the structure of the section. Replace it with real project data before publishing.

Enquiry Call us
400-000-0000
WeChat Scan to visit our site Scan to visit our site
Email
sales@example.com