Menu

Precision Fluid Control Components · R&D / Manufacturing / OEM Support

2026.08.23

New energy and storage battery pack housing potting: thermal grease case study

Background

An equipment integrator / manufacturer in New energy and storage needed to potting on a battery pack housing using thermal grease.

Process challenge

Micro-litre volumes with expensive material and no waste allowed.

Solution

We recommended Glue Supply System + Screw Valve + Glue Distributing Machine, with using a precision dispensing valve with suck-back and servo three-axis motion for uniform coating.

Result

  • Filler-related stoppages reduced from three per week to one per month.
  • Shot volume 4 mL with deviation within ±2%.
  • Cycle time 1.1 s per dot with no stringing or dripping during continuous running.

Project facts

  • Industry: New energy and storage
  • Workpiece: battery pack housing
  • Fluid: thermal grease
  • Process: potting
  • Recommended lines: Glue Supply System, Screw Valve, Glue Distributing Machine

Note: this case is placeholder demo content showing the structure of the section. Replace it with real project data before publishing.

Enquiry Call us
400-000-0000
WeChat Scan to visit our site Scan to visit our site
Email
sales@example.com